Projects Under Development:

3D rendering of a small infrastructure facility with parking, solar panels, and modular units, surrounded by a fenced area and adjacent to a paved road.

Brooklyn New York

This 5MW / 20MWh facility will provide resilience and emergency backup power to the surrounding distribution network.

The site will also boast two 180 kW Supercharge stations, serving as many as four electric vehicles at one time.

Planned Completion Date: Fall 2026

Callery Pear Place

A rooftop solar panel installation enclosed by brick walls, featuring multiple solar panels, a white building, and electrical units, with two small figures in safety gear near the equipment.

Brooklyn New York

This 5MW / 20MWh facility will provide resilience and emergency backup power to the surrounding distribution network.

Planned Completion Date: Fall 2026

The Green Line

3D rendering of an industrial building with solar panels on the roof, surrounded by a fence, parking lot, and security guard station.

Queens New York

This 5MW / 20MWh facility will provide resilience and emergency backup power to the surrounding distribution network.

Planned Completion Date: Fall 2026

Brookhaven

A 3D rendering of a secure facility with multiple modular buildings, solar panels, and a surrounding fence. There are trees along the sidewalk outside the fenced area.

Brooklyn New York

This 20MW / 80 MWh project will be a first of its kind bulk energy storage system and provide resilience and emergency backup power to the surrounding distribution network.

Planned Completion Date: Fall 2026

River Birch

3D rendering of a data center with cooling units, electrical equipment, and parking lot with four cars, surrounded by a security fence and sidewalk

Brooklyn, New York

This 5MW battery storage facility will help promote sustainability of the NYC grid. It will also be equipped with three 180 kV Supercharger stations, it will offer swift charging capabilities for up to six electric vehicles concurrently.

Planned Completion Date: Fall 2026

Oak Haven

3D rendering of an industrial outdoor facility with containers, fencing, a parking area with a car, and a street.

Brooklyn, New York

This 5MW battery storage facility will provide resiliency and capacity to New York City’s electric grid. The site will accommodate one 180 kV Supercharger station, facilitating rapid charging for up to two electric vehicles simultaneously.

Planned Completion Date: Fall 2026

Arcadia Forge

A 3D rendering of a solar-powered data center with multiple white modular buildings, solar panel-covered structures, parking spaces, and a surrounding fence with trees outside.

Brooklyn, New York

This 10MW battery storage facility will be in a critical network of New York City. The site will accommodate three 180 kV Supercharger stations, facilitating rapid charging for up to six electric vehicles simultaneously.

Planned Completion Date: Fall 2026

Maple Grove