57-77 Rust Street

Located in Maspath Queens, this property was formerly a ConEd Substation.

The facility houses 5MW / 20MWh of energy storage and a public 180kW EV charger. The site has two public EV chargers - at 180kW each they are the fastest in NYC.

Construction workers and equipment lifting a large structure into place with a crane on a sunny day.
Workers with safety gear guide a large white battery container into place using a crane in an outdoor construction site.
Aerial view of a BESS site with various equipment, parked cars, small structures, and surrounding urban buildings and streets.
Aerial view of a BESS site
Aerial view of a BESS site
Aerial view of a BESS site
Construction workers installing battery containers using a crane. Equipment is visible around the site.
An array of large modular battery units.
Large white battery containers with labels 2, 4, 6, and 8, surrounded by a metal framework with transparent plastic or glass panels on top, on a gravel lot with parked cars and neighboring brick and wooden buildings.
An aerial view of a BESS site, and the backs of several buildings showing rooftops, some with HVAC units, at sunset.